Longwy, collaborating with social housing authorities
Project sponsor(s)Longwy Town councilSchedule2009-2023Summary2009 - Phillipe Prost Study
2012 - guideline plan
2012 - archaeological survey
2013 -2023 –work carried out
Longwy, ‘Tour de ville’ project
Project sponsor(s)Longwy Town CouncilSchedule20 yearsSummarySurface area inside the fortified city: 15ha
Contracting authority: commune of Longwy
Implementation: 20 years
Number of inhabitants (INSEE 2011): 14,628
Contractor: Philippe Prost Architectural firm
Study carried out by 2009
Mont-Louis: From inter-communal monument protection towards a territorial project
Project sponsor(s)PNR des Pyrénées catalanesSchedule2009-2013SummaryA recognisable defensive landscape
The Mont-Louis stronghold comprises a town and a citadel, created from scratch in 1679 within a mountain setting in the heart of what is now the Regional Natural Park of the Catalan Pyrenees.
The zones of co-visibility between this fortress and the surrounding...Requalification of the parade ground
Project sponsor(s)Town of BriançonSchedule2010-2011SummaryRedevelopment of the parade ground to enhance a historic part of the town and revitalise an area for day to day use. Reconstruction of the stone walls of the well to Vauban’s original design. Restoration of the parade ground- demolition – site preparation; repairs – cleaning; access; drainage...